Groundbreaking: May 1, 2014

Opening: April 6, 2016

stanley cup finals mic'd up

Owner: T-Mobile Arena, owned by AEG and MGM Resorts International

Operator: MGM Resorts International

Sales Agent: AEGtickets montreal canadiens bell centre

Project Manager: ICON Venue Groupstarting goalie vancouver canucks

Architect: Populous

Construction Manager: Hunt-Penta Joint Venture

Functions: Multipurpose Entertainment venue available to host NBA and NHL teams, concerts, boxing, mixed martial arts, award shows and other major events

Project Cost: $375 million

Site Acreage: Approximately 16 acres

Arena Square Footage: 650,000 square feet

stanley cup finals mic'd up

Events: 100 to 150 annually

Seating Capacities: Boxing/UFC: 20,000

End Stage Concerts: 12,000 – 18,000 Center Stage Concert: 19,500 – 20,000 Hockey: 17,500 Basketball: 18,000

Sustainable Design: Designed for U.S. Green Building Council LEED Gold Certification

Amenities:toronto maple leafs careers

    stanley cup finals mic'd up

  • World-class Las Vegas-style design
  • Unrivaled Premium Seating Products
  • 50 luxury suites
  • More than two dozen private loge boxes
  • Two dedicated VIP Entrances
  • Two-acre outdoor Toshiba Plaza for pre-event functions and special events
  • Premium balconies on all VIP and public levels with views to the plaza, park and Strip
  • Multiple locker facilities, premium dressing rooms, green room and multipurpose spaces to accommodate a variety of sports and entertainment events.
  • stanley cup finals mic'd up

  • Wide variety of food and beverage options at each level
  • ADA accessibility on every level
  • A 75,000-square-foot loading dock, staging, storage, and other facilities to accommodate major events including six truck docks

     

fans first calgary flames retro winnipeg jets jersey

Tags:

Leave a Reply

Your email address will not be published. Required fields are marked *